Nissan Interstar
COMPARE POWERTRAINS AND BATTERY CHARGING TIME
Nissan Interstar
COMPARE POWERTRAINS AND BATTERY CHARGING TIME
Nissan Interstar
COMPARE POWERTRAINS AND BATTERY CHARGING TIME
Nissan Interstar
COMPARE POWERTRAINS AND BATTERY CHARGING TIME
Motor Power kW |
Motor Torque Nm |
PTW | Autonomy | DC Charging(7) | AC charging(6) | ||
---|---|---|---|---|---|---|---|
Long Range 87kWh | 105 | 300 | 3.5T 4.0T |
285 miles [1][2] | Std (130kW) |
22kW (std) 11kW (std) |
|
Std Range 40kWh | 96 | 300 | 3.5T 3.8T |
124 miles [1][2] | Std (50kW) |
11kW (std) |
Engine Max Power kW |
Engine Max Torque kW |
6-speed Manual Gearbox |
9-speed Automatic Gearbox |
||
---|---|---|---|---|---|
dCi 170 | 125 | 380 | 3.5T, 4.0T |
3.5T | |
dCi 150 | 110 | 360 | 3.5T |
3.5T, 4.0T | |
dCi 130 | 96 | 350 | 3.5T | - | |
dCi 105 | 77 | 330 | 3.3T | - |
Domestic Charging
Domestic Charging
Domestic Charging
Battery type | Standard Range 40Kwh |
Standard Range 40Kwh |
Long Range 87Kwh |
Long Range 87Kwh |
Long Range 87Kwh |
---|---|---|---|---|---|
Range recovery | - 50 km |
- 170 km |
- 50 km |
- 170 km |
- 400 km |
7.4kW wall charger |
1h55 | 5h44 | 1h55 | 5h44 | 13h54 |
3.7kW wall charger | 3h55 | 11h46 | 3H55 | 11h46 | 28h30 |
Occasional 3-pin plug 2.3KW charging cable |
6h28 | 21h59 | 6h28 | 21h59 | 47h02 |
Public Charging
Public Charging
Public Charging
Battery type | Standard Range 40Kwh |
Standard Range 40Kwh |
Long Range 87Kwh |
Long Range 87Kwh |
Long Range 87Kwh |
---|---|---|---|---|---|
Range recovery | - 50 km |
- 170 km |
- 50 km |
- 170 km |
- 400 km |
DC 150kW rapid charger (5) |
0h15 | 1h00 | 0h06 | 0h19 | 1h10 |
AC 22kW fast charger (incl.) | 0h38 | 1h53 | 0h38 | 1h53 | 4h35 |
[1] WLTP figures shown are for comparability purposes. Actual real world driving results may vary depending on factors including the starting charge of the battery, accessories fitted after registration, weather conditions, driving styles and vehicle load.
365km or 150km respectively is for the N2 (4.0T or 3.8T) Van derivatives.
[2] Data updated from February 2024, final data subject to final homologation.
[3] Nissan Interstar dCi, gasoline/diesel: fuel consumption (l/100 km): 7.4 – 8.5; CO2 emissions combined (g/km): 194 –222g. Vehicle has been homologated in accordance with EU regulations using the more realistic WLTP test procedure.
[4] Figures quoted are for 40kWh and 87kWh batteries. Charging speed and time is dependent on various conditions, including charger type and condition, batterytemperature as well as ambient temperature at the point of use. In cold climates, the use of on-board battery heating may be required to specifically improve quickcharging speeds. Indicated quick charging time requires use of a CCS 2 charger. The Nissan Interstar is equipped with charging safeguards to protect the batteryduring repeated quick charging sessions in a short period of time. The time taken for successive quick charging can take longer if the battery temperature activatesthe battery safeguarding technology.
Power consumption (Wh/km): 21kWh/100km energy consumption; CO2 emission combined (g/km): 0. Zero CO2 emissions while driving.
[5] Maximum DC charging speed is 50kW for 40kWh battery; 130kW for 87kWh battery.
[6] 11KW and 22KW require a three phase power charger.
[7] DC charging available on the public charger - visit https://www.zap-map.com/ for coverage details. Charging time may vary depending on charging conditions, including charger type and condition, on-site power usage, battery temperature as well as ambient temperature at point of use, battery age and state of charge, and if battery safeguarding technology is activated.
Images and descriptions shown are for guidance purposes. In some instances, photos are of non-Irish specification vehicles and do not represent a specific model, grade, or offer. The features shown standard and/or optional (at an extra charge) on selected models.